We’re Hiring!
Explore Open PositionsBuist contributed to the construction of Michigan’s first Consolidated Rental Car Facility (ConRAC) at Gerald R. Ford International Airport in Grand Rapids. The approximately 800,000 sq.ft. facility brings rental car operations together in one location, improving efficiency and accessibility for travelers while supporting the airport’s continued growth. Buist provided Contracting, Communications, Outdoor Utilities, and Testing services.
The ConRAC consists of three primary areas: the Quick Turnaround Area (QTA), Ready Return (RR), and Customer Service Building (CSB). The QTA includes eight car washes, eight fueling islands, and supporting areas for vehicle cleaning, staging, and maintenance. The RR provides designated spaces for rental car pickup and drop-off, while the CSB houses rental car counters and customer support areas. A skybridge connects the facility directly to the existing airport terminal, providing convenient access for travelers.
Buist’s scope of work included electrical infrastructure throughout the parking structure, power distribution equipment, lighting, and two generators providing backup power to both sides of the facility. Approximately 2,000 light fixtures were installed throughout the project. The cast-in-place concrete structure required extensive coordination to route and embed electrical conduit within the slabs while working around post-tensioning cables. This approach minimized exposed infrastructure throughout the facility. Electrical testing was performed to verify proper equipment operation and system performance.
Buist installed approximately half a mile of Category 6A cabling, one mile of access control cabling, and half a mile of fiber optic cabling to support the facility’s communications and security infrastructure.
Buist is proud to have contributed to a facility designed to improve the traveler experience at Gerald R. Ford International Airport.
